|   |  | 
 
  INSTALLATION INSTRUCTIONS FOR SYSTEMS SINGLE CHANNEL GROUND AND AIRBORNE RADIO SYSTEM (SINCGARS) AN/VRC-88F, AN/VRC-89F, AN/VRC-90F FORCE XXI BATTLE COMMAND, BRIGADE-AND-BELOW (FBCB2) AN/UYK-128 (V)4 INSTALLATION INSTRUCTIONS is changed as follows LIST OF EFFECTIVE PAGES TABLE OF CONTENTS TABLE OF CONTENTS-continued TABLE OF CONTENTS-continuedCHAPTER 1. INTRODUCTIONCHAPTER 2. PURPOSE OF INSTALLATIONCHAPTER 3. COMPLETION TIME FOR INSTALLATIONCHAPTER 4. PREPARATION FOR INSTALLATIONSection IX. C4ISR EQUIPMENT, DISTRIBUTION, AND CONSUMABLESTable 4-1. Kit Parts List for Installation of C4ISR Equipment.Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment.Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment (Contd).Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment (Contd).CHAPTER 5. INSTALLATION PROCEDURESFigure 5-2.Figure 5-3.Install five nut sleeves Section IV. B-BEAM PREPARATIONSection V. ASSEMBLY OF CAB ENCLOSURE PANELSection VI. FINAL ASSEMBLY, TERMINAL BOARD WIRING, AND TERMINAL LINKConnect wireRoute 24V power cableInstall cab enclosure panelSecure three 24V fusewire assembliesSection VII. INTEGRATED RACK INSTALLATIONRemove paint from vicinity of three mounting slotsSection VIII. INSTALLATION OF SINCGARS MOUNTING TRAY AND AMP GUARDSection IX. FBCB2 COMPONENTS INSTALLATIONInstall ramball mountSection IX.A. SERIAL INTERFACE ADAPTER DEVICE (SIAD) CABLES INSTALLATIONSection IX.B. SERIAL INTERFACE ADAPTER DEVICE (SIAD) INSTALLATIONSection IX.C. FBCB2 CABLES INSTALLATIONInstall Vehicular Amplifier Adapter (VAA)Section X. LOUDSPEAKER INSTALLATIONUsing mounting plateInstall mounting plateAttach loudspeakerSection XI. LOUDSPEAKER CABLES INSTALLATIONSection XII. PLGR BRACKET INSTALLATIONSection XIII. PLGR POWER CABLE ROUTINGAttach shrink tubingSection XIV. ANTENNA ASSEMBLYSection XV. SINCGARS ANTENNA MOUNTINGLocate and drill out second rivetUsing support bracketRemove paint from all mounting holesAttach antenna mounting bracketInstall front grillRemove ten screws Using support bracketRemove paint from both sides of mounting holesAttach antenna mounting bracketInstall front grill Remove antenna mount plateRemove nine screwsLocate and drill out second rivetPlace support bracketSecure top of support bracketInstall front grill Using support bracket Remove paint from mounting holes Attach antenna mounting bracketRemove nine screwsLocate and drill out second rivetPlace support bracketSecure bottom of support bracketInstall front grillSection XVI: EPLRS ANTENNA MOUNTINGSection XVII: EPLRS MOUNTINGMount resilient mountInsert four screwsPosition EPLRS mounting plateSection XVIII. URO BRACKET MOUNTINGSection XIX: ANTENNA CABLE ROUTINGFigure 5-77.Connect RF cableRoute RF cableFigure 5-81Feed PLGR antenna cableFigure 5-83.Locate, mark, and drill 1.00-inch diameter holeFigure 5-85.Connect PLGR antenna cableRoute RF cableFeed RF cableFigure 5-89.Connect RF cableFigure 5-92.Thread PLGR antenna cableRoute PLGR antenna cable Figure 5-96Route PLGR antenna cableConnect RF cableFigure 5-99Figure 5-100Route PLGR antenna cableFigure 5-103Thread PLGR antenna cable Route PLGR antenna cable Figure 5-107Figure 5-108Route PLGR antenna cableConnect RF cableSection XX: EPLRS CABLE ROUTINGCoil EPLRS power cableRoute EPLRS power cableFigure 5-114.Route EPLRS power cableAttach shrink tubingSection XXI. DVE HOOD CABLE GUIDE INSTALLATIONLocate, mark, and cut areaSection XXII. DVE PAN AND TILT MODULE (PTM) MOUNT ASSEMBLY PREPARATION AND PILLAR MOUNT INSTALLATIONSection XXIII. DVE A-FRAME CABLE GUIDE AND PAN AND TILT MODULE (PTM) MOUNT ASSEMBLY INSTALLATIONFigure 5-120Using A-frame cable guideInstall PTM mount assemblySection XXIV. DRIVER'S NBC AIR LINE AND HEATER REMOVALFigure 5-123Section XXV. DCM ROOF MOUNTING ASSEMBLY INSTALLATIONFigure 5-124.Section XXVI. PAN AND TILT MODULE (PTM) CONTROL MOUNTING BRACKET INSTALLATIONFigure 5-126.Section XXVII. PAN AND TILT MODULE (PTM) CONTROL ASSEMBLY, CONTROL CABLE ASSEMBLY, AND DCM/PTM INTERCONNECT CABLE INSTALLATIONFigure 5-128.Secure PTM connector endFigure 5-131.Install control cable seal assembly rubber grommetSection XXVIII. STOWAGE ASSEMBLY INSTALLATIONSection XXIX. DVE POWER CABLE INSTALLATIONFigure 5-139. Blank Page Blank Page RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS TB-9-2320-280-35-5 Blank Page RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS Blank Page Blank Page Blank Page Distribution Blank Page Blank Page RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS Blank Page Blank Page Blank Page RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS Blank Page RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS Distribution
 
 
 |