Click here to make tpub.com your Home Page

Page Title: Attach shrink tubing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-5
NOTE
PLGR power cable positive lead insulation is ribbed.
13-3. Attach shrink tubing (6) and terminal lugs (4) and (10) to PLGR power cable negative lead (9) and
PLGR power cable positive lead (7). (Refer to TM9-2320-280-20 for terminal connector repair.)
13-4. Attach PLGR power cable positive lead (7) to 24-volt terminal board (12) located on cab enclosure
panel (13) with existing nut (5).
13-5. Attach PLGR power cable negative lead (9) to ground strap (11) located on cab enclosure panel (13)
with existing nut (5).
13-6. Coil excess positive and negative power leads, place beneath ground strap, and secure with tiedown
strap (8).
13-7. Install right side tunnel insulation. (Refer to TM 9-2320-280-20.)
5
4
6
13
7
8
~
12
11
5
10
9
6
4.
TERMINAL LUG 7728780 QTY. 1
6.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
8.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
10.
TERMINAL LUG 7728777 QTY. 1
Figure. 5-31.
5-24


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business