| 
 | ||||||||||
| 
 |  TB 9-2320-280-35-5 INSTALLATION PROCEDURES Section I. SCOPE This chapter provides instructions for installation of the following C4ISR equipment:  Single Channel Ground and Airborne Radio System (SINCGARS)  Precision Lightweight Global Positioning System Receiver (PLGR)  Enhanced Position Location Reporting System (EPLRS)  Force XXI Battle Command, Brigade-and-Below (FBCB2)  Driver's Vision Enhancer (DVE)  Additional terminal boards in the vehicle Perform the steps in this chapter when installing SINCGARS, PLGR, EPLRS, FBCB2, and additional terminal boards. When installing C4ISR equipment, be sure to read and follow instructions and illustrations carefully. Section II. INSTALLATION OF TERMINAL BOARDS Use the following procedure to install additional terminal boards to provide adequate power connections. Vehicles must have dual-voltage alternators installed in order to have both 12V and 24V terminal boards installed. Section III. CAB ENCLOSURE PANEL, TERMINAL BOARD, AND COVER MODIFICATION NOTE  For vehicles without cab enclosure panel, begin with step 3-1.  For vehicles with cab enclosure panel, begin with step 3-3.  All dimensions are in inches. 3-1. Place enclosure panel (3) in position. Locate, mark, and drill five 0.157-in. diameter holes marked A and B in B-beam (1) and battery box (2). 3-2. Enlarge two lower mounting holes marked A to 0.276-in. diameter, and install two inserts (4) in battery box (2). 3. ENCLOSURE PANEL  12447141  QTY. 1 2 4. INSERT  12446871-2  QTY. 2 1 B ~ B B 3 A A 4 Figure 5-1. | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |