Section XXIII. DVE A-FRAME CABLE GUIDE AND PAN AND TILT MODULE (PTM) MOUNT
ASSEMBLY INSTALLATION
23-1. Remove two screws (2), nuts (5), and clamps (1) from A-frame pillar flange (6). Retain hardware.
NOTE
Use template, if available, to mark cutout area for the A-frame
cable guide.
23-2. Locate and mark cutout area (3) on A-frame pillar flange (6).
23-3. Cut out area (3) of A-frame pillar flange (6) flush with vertical wall (4). Use fine mill file or crocus
cloth to remove all burrs and sharp edges.
|