| 
 | ||||||||||
| 
 |  TB 9-2320-280-35-5 Section XII. PLGR BRACKET INSTALLATION 12-1. Install PLGR bracket (11) on integrated rack (1) with four screws (12). 12-2. Locate, mark, and drill one 0.201-in. diameter hole (9) in right side engine tunnel (10). 12-3. Remove paint from vicinity of hole (8) on integrated rack (1) and hole (9) on right side engine tunnel (10). Apply antiseize compound as required. 12-4. Fabricate ground strap (4) from 8.00-in. length of braided wire and two terminal lugs. 12-5. Install ground strap (4) on integrated rack (1) with capscrew (5), three lockwashers (2), and nut (3). 12-6. Install ground strap (4) on right side engine tunnel (10) with self-tapping screw (7) and two lockwashers (6). 4 2 5 6 7 3 8 2 1 9 ~ 10 11 2. LOCKWASHER  MS45904-68  QTY. 3 3. NUT  9419143  QTY. 1 12 4. GROUND STRAP  BRAIDED WIRE  AA59569F30T0375  QTY. A/R  TERMINAL LUG  MS20659-129  QTY. 2 5. CAPSCREW  B1821BH025C100N  QTY. 1 6. LOCKWASHER  MS35338-43  QTY. 2 7. SELF-TAPPING SCREW  9426241  QTY. 1 11. PLGR BRACKET  986-0645-001  QTY. 1 12. SCREW  MS35206-263  QTY. 4 Figure 5-29. | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |