Click here to make tpub.com your Home Page

Page Title: Replacement of Parts in Power Supply Chassis Assembly 1A1A13
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
Figure 3-6. Radio patch panel (p/o 1A15), top interior view, part location.
(f) Release meter panel assembly
multiplier metering
1A15A8 and position it downward until it rests against
circuits (para 3-59).
electrical equipment cabinet 1A15.
1A16AR5 ............................ Calibration of T-1054/
(g) Tighten the two screws from front
GRC-144 reflected rf
of 1A15A8 (C, fig. 3-8) to secure the housing to the
power metering circuit
cover.
(para 385).
(h) Insert the lens assembly into the
1A15A8R6........................... Calibration of T-1054/
housing so that the bulb board slot aligns with the bulb
GRC-44 rf power
board index key (D, fig. 3-8).
metering circuit (para
13-57).
(i) Replace the new lens and diffuser
1A15A8R7........................... Calibration of T-1054/
with the lens and diffuser of replaced indicator light
GR-144 traffic meter-
assembly (B, fig. 3-8).
ing circuit I(para 3-60).
(j) Rotate lens assembly 90 so that
3-22. Replacement of Parts in Power Supply
lens and legend index it at top of light, 'then push lens
Chassis Assembly 1A1A13
assembly into housing.
(k) Finger tighten the two meter panel
captive screws to secure meter panel assembly
To replace any part in power supply chassis assembly
1A15A8.
1A1A13; remove power supply 1A1 (a below) and refer
c.  Replacement  of Potentiometer  1A15A8R2
to applicable replacement procedure (b through f below)
through  1A14A8R7  (fig.
To  replace  a
for the part to be replaced.  After the part has been
potentiometer, remove equipment power (para 320a),
replaced, refer to the steps of g below for replacement
replace the defective potentiometer, restore equipment
of power supply 1A1. Parts, located on terminal boards
power (para 3-20b) and then perform the applicable
1A1A13TB1 and 1A1A14TB2 are removed using
calibration procedure listed in the chart below.
standard soldering techniques (para 3-19).
POTENTIOMETER CALIBRATION
a. Removal of Power Supply 1A1.
Potentiometer
Calibration procedure
(1) Set the POWER  ON/OFF  switch on
1A15A8R2, A15A8SR3,
Calibration of T-1054/ and
meter panel assembly 1A15A8 to OFF.
1A15ASR4.
GRC-144 frequency
Potentiometer
Calibration procedure
3-37


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business