Screws are different lengths. Mark screws for installation.
10-25. Remove six screws (38) from wood insulation (39) and lift front of insulation from tunnel floor (40).
CAUTION
Ensure INC-EPUU cable lays flat against floor. Cable should be
off insulation and between floor ribs. Failure to comply may result
in equipment damage.
10-26. Route INC-EPUU cable (20) along tunnel floor (40).
10-27. Install wood insulation (39) on tunnel floor (40) with six existing screws (38).
39
20
38
~
40