• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section X. EPLRS CABLES INSTALLATION - Continued
Section X. EPLRS CABLES INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
TB 9-2320-387-35-8
NOTE
Screws are different lengths. Mark screws for installation.
10-25. Remove six screws (38) from wood insulation (39) and lift front of insulation from tunnel floor (40).
CAUTION
Ensure INC-EPUU cable lays flat against floor. Cable should be
off insulation and between floor ribs. Failure to comply may result
in equipment damage.
10-26. Route INC-EPUU cable (20) along tunnel floor (40).
10-27. Install wood insulation (39) on tunnel floor (40) with six existing screws (38).
39
20
38
~
40
Figure 5-70.
5-60


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.