• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section X. EPLRS CABLES INSTALLATION - Continued
Section X. EPLRS CABLES INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
img
TB 9-2320-387-35-8
10-18. Remove three self-tapping screws (35) and washers (36) from insulation (37) and tunnel (34).
10-19. Install 24 inches of spiral wrap (22) on INC-EPUU cable (20) and secure with electrical tape (21)
10-20. Route INC-EPUU cable (20) under tunnel insulation (37).
CAUTION
Ensure INC-EPUU cable is not pinched between tunnel
insulation, tunnel, and washers when tightening self-tapping
screws. Failure to comply may result in equipment damage.
10-21. Secure tunnel insulation (37) to tunnel (34) with three existing self-tapping screws (35) and
washers (36).
34
35
36
37
~
21
22 20
1
21. ELECTRICAL TAPE HH-I-595-A-108-0 QTY. A/R
22. SPIRAL WRAP 11644992 QTY. 24 INCHES
Figure 5-67.
5-58


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.