• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section X. EPLRS CABLES INSTALLATION - Continued
Section X. EPLRS CABLES INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  70    71    72    73    74  75  76    77    78    79    80  
img
TB 9-2320-387-35-8
10-34. Disconnect rear evaporator electrical harness (60) from evaporator (54).
10-35. Remove three self-tapping screws (55), clamps (56), rear evaporator electrical harness (60), and
three washers (57) from insulation (58) and tunnel (59).
10-36. Route EPLRS power cable (23) under insulation (58) to right B-beam.
CAUTION
Ensure EPLRS power cable is not pinched between tunnel
insulation, tunnel, clamps, and washers when tightening
self-tapping screws. Failure to comply may result in equipment
damage.
10-37. Install insulation (58) on tunnel (59) with three existing self-tapping screws (55), clamps (56),
washers (57), and rear evaporator electrical harness (60).
10-38. Connect rear evaporator electrical harness (60) to evaporator (54).
54
55
60
56
57
56
57
56
57
~
58
~
23
59
Figure 5-74.
5-64


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.