TB 9-2320-387-35-8
10-34. Disconnect rear evaporator electrical harness (60) from evaporator (54).
10-35. Remove three self-tapping screws (55), clamps (56), rear evaporator electrical harness (60), and
three washers (57) from insulation (58) and tunnel (59).
10-36. Route EPLRS power cable (23) under insulation (58) to right B-beam.
CAUTION
Ensure EPLRS power cable is not pinched between tunnel
insulation, tunnel, clamps, and washers when tightening
self-tapping screws. Failure to comply may result in equipment
damage.
10-37. Install insulation (58) on tunnel (59) with three existing self-tapping screws (55), clamps (56),
washers (57), and rear evaporator electrical harness (60).
10-38. Connect rear evaporator electrical harness (60) to evaporator (54).
54
55
60
56
57
56
57
56
57
~
58
~
23
59
Figure 5-74.
5-64