TB 9-2320-387-35-8
Section VII. EPLRS RESILIENT MOUNT INSTALLATION
NOTE
Perform either BFT installation or EPLRS installation. For BFT
installation, see section V.
7-1. Position EPLRS resilient mount (1) on left side interface plate (2).
7-2. Using EPLRS resilient mount (1) as template, locate and mark four hole positions (6) in left side
interface plate (2).
7-3. Remove EPLRS resilient mount (1) from left side interface plate (2).
7-4. Drill four 0.531-in. diameter holes (6) in left side interface plate (2).
7-5. Install four inserts (5) in holes (6) in left side interface plate (2).
7-6. Install EPLRS resilient mount (1) on left side interface plate (2) with four capscrews (3) and
7-7. Install EPLRS unit (7) in EPLRS mount (1).
7-8. Connect ground leads (8) to EPLRS unit (7).
2
1
3.00
~
4.75
1. RESILIENT MOUNT MT-6146/VSQ-1 QTY. 1
Figure 5-55.