TB 9-2320-387-35-8
Section VI. INTERFACE PLATE INSTALLATION
NOTE
Perform Section VI if interface plate is not installed.
Perform either BFT installation or EPLRS installation. For
BFT installation, see section V.
6-1. Remove ten capscrews (1), lockwashers (2), and washers (3) from left side wheelhouse (4).
6-2. Install interface plate (6) on left side wheelhouse (4) with two existing capscrews (1),
lockwashers (2), and washers (3). Do not tighten capscrews (1) at this time.
6-3. Secure interface plate (6) to left side wheelhouse (4) with eight screws (5).
6-4. Tighten capscrews (1) and screws (5) to 6 lb-ft. (8 Nm).
1
2
3
4
~
Figure 5-53.