• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section V. BFT INSTALLATION - Continued
Section V. BFT INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
img
TB 9-2320-387-35-8
5-6. Connect connector (20) of transceiver cable (2) to transceiver connector (19).
NOTE
Ensure all slack in cable is inside vehicle.
5-7. Remove screw (8) from right side roof armor (17).
5-8. Route transceiver cable (2) along right side roof armor (17) with clamp (18), existing screw (8),
lockwasher (7), and existing washer (6).
8
7
6
18
17
~
19
20
2
7. LOCKWASHER MS35338-44 QTY. 1
18. CLAMP, LOOP MS21333-101 QTY. 1
Figure 5-48.
5-42


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.