TB 9-2320-387-35-7
Section VII. EPLRS RESILIENT MOUNT INSTALLATION
NOTE
Perform either BFT installation or EPLRS installation. For BFT
installation, see section V.
7-1.
Position EPLRS resilient mount (1) on left side interface plate (2).
7-2.
Using EPLRS resilient mount (1) as template, locate, and mark four hole positions (6) in left side
interface plate (2).
7-3.
Remove EPLRS resilient mount (1) from left side interface plate (2).
7-4.
Drill four 0.531-in. diameter holes (6) in left side interface plate (2).
7-5.
Install four inserts (5) in holes (6) in left side interface plate (2).
7-6.
Install EPLRS resilient mount (1) on left side interface plate (2) with four capscrews (3) and
7-7.
Install EPLRS unit (7) in EPLRS mount (1).
7-8.
Connect ground leads (8) to EPLRS unit (7).