• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section VI. INTERFACE PLATE INSTALLATION - Continued
Section VII. EPLRS RESILIENT MOUNT INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
img
.
TB 9-2320-387-35-7
Section VII. EPLRS RESILIENT MOUNT INSTALLATION
NOTE
Perform either BFT installation or EPLRS installation. For BFT
installation, see section V.
7-1.
Position EPLRS resilient mount (1) on left side interface plate (2).
7-2.
Using EPLRS resilient mount (1) as template, locate, and mark four hole positions (6) in left side
interface plate (2).
7-3.
Remove EPLRS resilient mount (1) from left side interface plate (2).
7-4.
Drill four 0.531-in. diameter holes (6) in left side interface plate (2).
7-5.
Install four inserts (5) in holes (6) in left side interface plate (2).
7-6.
Install EPLRS resilient mount (1) on left side interface plate (2) with four capscrews (3) and
lockwashers (4).
7-7.
Install EPLRS unit (7) in EPLRS mount (1).
7-8.
Connect ground leads (8) to EPLRS unit (7).
1
2
~
3.00
4.75
1. RESILIENT MOUNT MT-6146/VSQ-1 QTY. 1
Figure 5-51.
5-44


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.