• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section VIII. EPLRS CABLING - Continued
Section VIII. EPLRS CABLING - Continued

Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038) Page Navigation
  60    61    62    63    64  65  66    67    68    69    70  
img
TB 9-2320-387-35-6
8-20. Remove two screws (32) and washers (33) from each side of upper position of right-side rear seat
support bracket (34).
8-21. Disconnect connector (42) of rear evaporator electrical harness (36) from front evaporator (35).
8-22. Remove three self-tapping screws (37), washers (39), clamps (38), and rear evaporator wiring
harness (36) from tunnel insulation (40) and tunnel (41).
8-23. Route EPLRS power cable (10) and INC-EPUU cable (7) under tunnel insulation (40). Route EPLRS
power cable (10) towards cab enclosure panel.
8-24. Connect connector (42) of rear evaporator electrical harness (36) to front evaporator (35).
CAUTION
Ensure EPLRS power cable and INC-EPUU cable are not pinched
under tunnel insulation. Damage to equipment can occur.
8-25. Secure tunnel insulation (40), three clamps (38), and wiring harness (36) to tunnel (40) with three
existing self-tapping screws (37) and washers (39).
8-26. Install two existing screws (32) and washers (33) to each side of upper position of right-side rear
seat support bracket (34).
33
32
34
Figure 5-65.
35
42
36
37
38 39
37
38
39
37
38
39
40
7
10
41
Figure 5-66.
5-54


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.