• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. INTEGRATED RACK INSTALLATION - Continued
Section II. INTEGRATED RACK INSTALLATION - Continued

Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038) Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
img
TB 9-2320-387-35-6
2-23. Temporarily install integrated rack (16) on rack support (30) with two capscrews (34).
2-24. Position rack support (30) and top mounting holes (35) of integrated rack (16) to radio rack
support plate (36).
2-25. Remove two capscrews (34) and integrated rack (16) from rack support (30).
2-26. Tighten rack support (30) to tunnel floor (10) with six capscrews (28) and (27).
35
16
34
36
10
~
30
28
27
34. CAPSCREW B1821BH025C088N QTY. 6
Figure 5-12.
5-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.