• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. INTEGRATED RACK INSTALLATION - Continued
Section II. INTEGRATED RACK INSTALLATION - Continued

Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038) Page Navigation
  16    17    18    19    20  21  22    23    24    25    26  
img
TB 9-2320-387-35-6
NOTE
Install W3N cable if using BFT only.
2-19. Install W3N cable (22) to J1 connector (26) on SIAD (24).
2-20. Install W3P cable (23) to J2 connector (25) on SIAD (24). Route W3P cable (23) to DAGR.
2-21. Install Serial Interface Adapter Device (SIAD) (24) on integrated rack (16) using two screws (21),
lockwashers (20), and washers (19).
16
19
20
21
25
24
26
22
23
19.
WASHER MS27183-47 QTY. 2
20.
LOCKWASHER MS35338-43 QTY. 2
21.
SCREW MS35207-263 QTY. 2
22.
W3N CABLE 881336-1 QTY. 1
23.
W3P CABLE 881335-1 QTY. 1
24.
SIAD 881331-1 QTY. 1
Figure 5-10.
5-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.