• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. INTEGRATED RACK INSTALLATION - Continued
Section II. INTEGRATED RACK INSTALLATION - Continued

Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038) Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
img
TB 9-2320-387-35-6
2-16. Secure air conditioning evaporator (7) to tunnel floor (10) with eight existing screws (4),
lockwashers (5), and washers (6).
2-17. Connect A/C rear evaporator electrical cable (8) to air conditioning evaporator (7).
10
4
5
7
6
~
4
8
5
6
5. LOCKWASHER MS35338-44 QTY. 8
Figure 5-8.
5-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.