Home
Download PDF
Order CD-ROM
Order in Print
Section II. INTEGRATED RACK INSTALLATION - Continued
Section II. INTEGRATED RACK INSTALLATION - Continued
Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038)
Page Navigation
14
15
16
17
18
19
20
21
22
23
24
TB
9-2320-387-35-6
2-16.
Secure
air
conditioning
evaporator
(7)
to
tunnel
floor
(10)
with
eight
existing
screws
(4),
lockwashers
(5),
and
washers
(6).
2-17.
Connect
A/C
rear
evaporator
electrical
cable
(8)
to
air
conditioning
evaporator
(7).
10
4
5
7
6
~
4
8
5
6
5.
LOCKWASHER
MS35338-44
QTY.
8
Figure
5-8.
5-8