Home
Download PDF
Order CD-ROM
Order in Print
Section II. INTEGRATED RACK INSTALLATION
Section II. INTEGRATED RACK INSTALLATION - Continued
Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038)
Page Navigation
9
10
11
12
13
14
15
16
17
18
19
TB
9-2320-387-35-6
2-6.
Remove
six
screws
(9)
from
tunnel
insulation
(3).
Retain
all
hardware.
3
~
9
Figure
5-3.
5-3