| |
- INSTALLATION INSTRUCTIONS FOR SYSTEMS SINGLE CHANNEL GROUND AND AIRBORNE RADIO SYSTEM (SINCGARS) AN/VRC-88F, AN/VRC-89F, AN/VRC-90F, AN/VRC-91F, AN/VRC-92F FORCE XXI BATTLE COMMAND, BRIGADE-AND-BELOW (FBCB2) AN/UYK-128(V)4
- INSTALLATION INSTRUCTIONS is changed as follows
- LIST OF EFFECTIVE PAGES
- REPORTING ERRORS AND RECOMMENDING IMPROVEMENTS
- TABLE OF CONTENTS
- LIST OF TABLES
- CHAPTER 1. INTRODUCTION
- CHAPTER 2. PURPOSE OF INSTALLATION
- CHAPTER 3. COMPLETION TIME FOR INSTALLATION
- CHAPTER 4. PREPARATION FOR INSTALLATION
- Section IX. C4ISR EQUIPMENT, DISTRIBUTION, AND CONSUMABLES
- Table 4-1. Kit Parts List for Installation of C4ISR Equipment.
- Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment.
- Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment (Contd).
- Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment (Contd).
- Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment (Contd).
- CHAPTER 5. INSTALLATION PROCEDURES
- Figure 5-2.
- Install grommet material
- Measure and cut terminal board
- Section IV. B-BEAM PREPARATION
- Section V. ASSEMBLY OF CAB ENCLOSURE PANEL
- Install 24V terminal board
- Section VI. FINAL ASSEMBLY, TERMINAL BOARD WIRING, AND TERMINAL LINK
- Position cab enclosure panel
- Route 24V power cable
- Install cab enclosure panel
- Secure three 24V fusewire assemblies
- Section VII. INTEGRATED RACK MOUNTING
- Figure 5-19.
- Install W3 cable
- Install rack support
- Position integrated rack
- Install integrated rack
- Section VIII. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION
- Place mounting bracket
- Install CPU isolation kit
- Remove paint from four mounting holes
- Insert weldment
- Insert footrest weldment
- Install master control station
- Connect W2 cable
- Install Vehicular Amplifier Adapter (VAA)
- Section IX. EPLRS MOUNTING INSTALLATION
- Using C-bracket mount
- Section X. EPLRS ANTENNA INSTALLATION
- Section XI. EPLRS USER READOUT (URO) INSTALLATION
- Section XII. SINCGARS ANTENNA INSTALLATION
- Install grommet
- Attach upper antenna element
- Section XIII. CABLES INSTALLATION
- Remove twelve screws
- Insert grommet
- Remove three screws
- Secure EPLRS power cable
- Route EPLRS power cable
- Connect SINCGARS antenna cable
- Route SINCGARS antenna cable
- Feed SINCGARS antenna cable
- Figure 5-55
- Route SINCGARS antenna cable
- Feed SINCGARS antenna cables
- Route EPLRS power cable
- Bundle all cables
- Route all cables
- Attach heat-shrink tubing
- Section XIV. VIC-3 MOUNTING INSTALLATION: REAR FFCS/L AND CABLES
- Install cable assembly
- Figure 5-64.1.
- Route two cable assemblies
- Figure 5-64.3.
- Section XV. PLGR MOUNTING BRACKET INSTALLATION
- Secure bracket
- Secure PLGR mount and bracket
- Section XVI. PLGR POWER CABLE INSTALLATION
- Section XVII. PLGR ANTENNA INSTALLATION AND CABLE ROUTING
- Split grommet
- Secure PLGR power cable
- Section XVIII. REAR RADIO RACK INSTALLATION
- Install forward inboard support leg
- Insert four capscrews
- Install transmission control module
- Install forward outboard support leg
- Secure top support
- Temporarily install mounting weldment
- Install blank shelf
- Install radio unit shelf
- Install blank shelf
- Install radio unit shelf
- Install side support
- Tighten eight existing screws
- Section XIX. SINCGARS MOUNT INSTALLATION: 90F OR 91F
- Section XX. FHMUX INSTALLATION
- Blank Page
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- TB-9-2320-387-35-2
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- Blank Page
- Distribution
- Blank Page
- Blank Page
- Blank Page
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- Blank Page
- Blank Page
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
- Blank Page
- Distribution
- RECOMMENDED CHANGES TO PUBLICATIONS AND BLANK FORMS
- Blank Page
|