|
| TB 9-2320-280-35-7
Section XXX. PAN AND TILT MODULE (PTM) CONTROL ASSEMBLY, CONTROL CABLE ASSEMBLY,
AND DCM/PTM INTERCONNECT CABLE INSTALLATION
30-1. Locate, mark, and drill 1.375-in. hole (1) for control cable seal assembly (2) on tunnel (3).
30-2. Position control cable seal assembly (2) and mark two hole locations (5).
30-3. Drill two 0.391-in. holes in marked locations (5).
30-4. Insert two rivet nuts (4) in tunnel (3).
2
1
4
5
6.50
2.00
2
~
5
3
4
2. CONTROL CABLE SEAL ASSEMBLY 3220908 QTY. 1
4. RIVET NUT 3221004-14 QTY. 2
Figure 5-96.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |