| ||||||||||
| 
 
  | ![]() TB 9-2320-280-35-7 
30-5. Insert DCM connector end of DCM/PTM interconnect cable (6) from transmission compartment 
through hole (1) in tunnel (3), through control cable seal assembly (2) and into 
driver's compartment. 
30-6. For vehicles equipped with FBCB2, route PTM control cable assembly (8) through PTM control 
mounting bracket (7). 
NOTE 
It may be necessary to remove azimuth lock cable adjusting nut to 
route cabling. 
30-7. Insert two cables (8) and (9) though control cable seal assembly (2) through control cable seal 
assembly (2). 
NOTE 
Holes in grommet must be enlarged to allow cables to fit. 
30-8. Cut sides of four holes on grommet of control cable seal assembly (2). 
30-9. Insert three cables (6), (8), and (9) through control cable seal assembly (2) into tunnel hole (1). 
30-10. Route three cables (6), (8), and (9) along exhaust pipe (10), body mount (12), and oil filter (11). 
Continue routing cables (6), (8), and (9) through engine compartment to A-frame cable guide (14) on 
A-frame pillar flange (13) to PTM mount assembly (15). 
5-76 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |