Click here to make tpub.com your Home Page

Page Title: Section XXIII. EPLRS CABLES INSTALLATION (FOUR-MAN VEHICLES)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-13
Section XXIII. EPLRS CABLES INSTALLATION (FOUR-MAN VEHICLES)
NOTE
Loosen tunnel insulation before performing steps 23-1 and 23-2.
(Refer to TM 9-2320-280-20.)
SINCGARS model AN/VRC-92F shown.
Perform following procedures for four-man vehicle configuration
only.
23-1. Route INC-EPUU cable (1) from integrated rack (3), down through center access hole (2), and under
left-side tunnel insulation (5) towards rear of vehicle.
23-2. Route power cable (4) from rear battery box forward and under integrated rack (3) and under
left-side tunnel insulation (5) towards rear of vehicle.
23-3. Secure left-side tunnel insulation (5). (Refer to TM 9-2320-280-20.)
1
2
5
3
4
TUNNEL
INSULATION
1. INC-EPUU CABLE A3279383-3 QTY. 1
4. EPLRS POWER CABLE A3004939 QTY. 1
Figure 5-90.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business