|
| TB 9-2320-280-35-1
Section XV. MTS CONTROL BOX INSTALLATION
NOTE
Ensure all holes have been drilled and inserts installed. (Refer to
15-1. Using MTS control box as template, locate, mark, and cut two 0.750-in. holes (2) in left-side tunnel
insulation (1).
2
1
Figure 5-45.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |