|
| TB 9-2320-280-35-1
NOTE
Spacers are installed between control box and tunnel floor and
only on front two mounting holes of control box, where tunnel
insulation has been cut.
Install spacer between right front mounting holes first.
Do not tighten screws until all hardware has been installed.
15-2. Install MTS control unit (3) on tunnel floor (10) with spacer (5), three lockwashers (12), washers (11),
and capscrews (13).
15-3. Locate, mark and drill 0.147-in. diameter hole (9) in tunnel floor (10).
15-4. Remove paint from vicinity of hole (9) in tunnel floor (10) and from corner (4) of control box (3).
Apply antiseize compound as required.
15-5. Fabricate ground strap (8) from 4-in. length of braided wire and two terminal lugs.
15-6. Install ground strap (8) on tunnel floor (10) with lockwasher (7) and self-tapping screw (6).
15-7. Install ground strap (8) on MTS control box (3) with lockwasher (12), washer (11), and
capscrew (13). Then mount control box (3) to tunnel floor (10) with spacer (5).
15-8. Tighten all screws (6) and (13).
3.
MTS CONTROL UNIT 7110-0315 QTY. 1
5.
SPACER 12340849 QTY. 2
6.
SELF-TAPPING SCREW 9418944 QTY. 1
7.
LOCKWASHER 120391 QTY. 1
3
8.
GROUND STRAP
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-141 QTY. 1
TERMINAL LUG MS20659-107 QTY. 1
11. WASHER 2436161 QTY. 4
12. LOCKWASHER MS35338-44 QTY. 4
13. CAPSCREW B1821BH025C113N QTY. 4
RIGHT FRONT
MOUNTING HOLE
5
6
4
RIGHT FRONT
MOUNTING HOLE
5
7
13
8
9
12
11
8
10
Figure 5-46.
5-39
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |