Click here to make tpub.com your Home Page

Page Title: Section II. OPERATIONAL INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-6625-847-12
Figure 3-6 (2). -- Continued.
Section II. OPERATIONAL INSTRUCTIONS
3-8.
General
This section provides turn-on, normal operation, and
Switch or control
Setting
shutdown procedures for the 2A/GRC.
PA/RT switch----------------------
PA.
KEY switch -----------------------
OFF.
3-9.
Charts
XMIT STATUS switch-----------
OPR.
The charts given in paragraphs 3-10 through 3-15
REC-XMIT switch ----------------
REC.
provide the operator with a fast, convenient, and safe
method of equipment turn-on; paragraph 3-10 covers
ALC VOLTAGE INFO-----------
Fully counterclock-
the preliminary switch and control settings for the test
control.  -----------------------
wise.
set, and paragraphs 3-11 through 3-16 cover the
ALC VOLTAGE TUNE----------
Fully counterclock-
individual test trays used with the test set.
control.  -----------------------
wise.
IF OSCILLATOR select --------
4.
3-10.
Test Set, Preliminary Switch and Control
Switch
Settings
MC FREQ 10MC switch --------
0.
MC FREQ 1MC switch ---------
0.
MC FREQ .1MC switch---------
0.
500 VDC LOAD switch ---------
LOW.
Switch or control
Setting
2400 VDC LOAD switch--------
1.
POWER switch ------------------
OFF.
SERV SEL switch
OFF.
3-21


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business