Click here to make tpub.com your Home Page

Page Title: PMCS Procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



2-5. PMCS Procedures
Corrective procedures for some of the faults that may be discovered during PMCS are located in Chapter 3. Faults, not
listed there, are to be referred to the next higher level of maintenance.
 Item No. Column. This column lists the sequence number of all procedures in the chart regardless of interval.
The item number in this column must be used as the entry in the "TM Number" column of DA form 2404, Equipment
Inspection and Maintenance Worksheet, in recording results of PMCS.
 Interval Column. This column lists the interval that each PMCS procedure is performed. A dot under the "B"
column indicates that the associated procedure will be performed before operation. A dot under the "d" column indicates
that the procedure will be performed during operation. A dot under the "A" column indicates that the procedure will be
performed after operation.
 Item To Be Inspected Column. This column identifies the item(s) on which the associated PMCS procedures
are performed.
Procedures Column. This column contains the PMCS procedures that are to be performed.
 Equipment Is Not Ready/Available If Column. This column describes the criteria by which the Radio Set
system will be considered not ready to perform its primary function.
2-11


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business