Page Title: Section IV. Performance test and Troubleshooting
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM
11-5820-919-40-1
SECTION
IV
PERFORMANCE
TEST
AND
TROUBLESHOOTING
GENERAL .
point  where  first  fault  indication
occurred.
If a flowchart is extended to
Performance  tests  and  trouble
another  sheet,  the  continuation  symbol
shooting of the radio set units and mod-
is  used.  Caution  and  warning  notes
ules requires a known good radio set as
appear  to  alert  the  user  to  potential
a  test  bed.  The  unit  (or  module)  under
equipment  or  human  hazards.
test  (UUT)  replaces  the  known  good  unit
or module of the test bed radio set, and
TEST  AND  TROUBLESHOOTING  REFER-
is connected to the test bed by fabri-
ENCE  DATA.
The  performance  test  flow-
cated  test  cables.
charts  are  used  in  conjunction  with  the
supporting  data  below.
PERFORMANCE  TEST
AND
depicts  the  arrangement  of  maintenance
TROUBLESHOOTING.
information  contained  in  each  mainte-
The  performance  test  flowcharts
3-59.
provide  the  necessary  procedures  and
Disassembly  and  Reassembly  Pro-
1.
information  to  completely  test  the
cedures.  These  procedures  provide
radio, a unit or a module (unit under
the  information  necessary  to
test).  The  flowcharts  also  provide
remove  and  replace  a  "Unit  Under
troubleshooting  procedures  as  an  aid  in
Test."
fault  isolating  to  a  group  of  components
if the UUT does not pass a performance
Performance  Test  Setup  Diagrams.
2.
test.
The  test  setup  diagrams  show  what
test  equipment  is  required  for  the
USE  OF  FLOWCHARTS  (Figure  3-13).
performance  test  and  troubleshoot-
The  performance  test  procedure  path  on
ing, and how to connect the test
the  flowcharts  is  indicated  by  a  heavy
equipment  to  the  "Unit  Under
The  procedure  begins  at  the
flow  line.
Test."
bubble  symbol  that  reads  "Unit  Under
Next,  the  initial  setup  block
Test."
Alignment  Procedures.  The  align-
3.
references  applicable  removal  disassem-
ment  procedures  are  performed  when
bly  and  reassembly  instructions,  a  test
specified  in  the  troubleshooting
setup  diagram,  and  provides  initial
They  are  usually
procedures.
switch  settings  required  for  the  test.
required  during  troubleshooting  to
The initial setup block is followed by a
ensure  the  "Unit  Under  Test"  is
series  of  procedural  blocks,  which
properly  aligned  before  determin-
contain  actions  required  to  produce  a
ing  faulty  components.
result,  and  decision  blocks,  which  asks
whether  the  desired  result  occurred.  If
Functional  Block  Diagrams.
4.
The
the  desired  result  has  occurred,  the
functional  block  diagrams  may  be
"yes"  pathway  is  followed;  if  the
used  as  an  aid  to  troubleshooting
desired  result  did  not  occur,  the  "no"
in  conjunction  with  the
pathway  is  followed  for  the  trouble-
flowcharts.
The
performance
shooting
procedure.
test  is  successfully  completed  when  the
Schematic
Diagram.
5.
The  schematics
"Test  Passed"  bubble  symbol  is  reached.
for the, "Unit Under Test" are used
The  troubleshooting  procedure  is  com-
to aid in' identifying suspected
pleted  when  a  fault-indication  block  is
faulty  components.  For  example,
Once  the  fault  is  corrected,
reached .
if the fault block on the trouble-
the  performance  test  is  resumed  at  the
shooting  flowcharts  calls  out