Click here to make tpub.com your Home Page

Page Title: POST-INSTALLATION CHECKOUT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-917-13
standby power for up to 24 hours (at 23C).
Refer to paragraphs 3-16 and 3-17
for additional information.
POST-INSTALLATION
CHECKOUT
2-26. The electrical performance of the receiver should be verified before being put
into normal operation.  The performance test described in section 5 is performed as
the post-installation checkout and prior to operation.
STORAGE
AND
RESHIPMENT
2-28. STORAGE.
The maximum recommended storage conditions should not exceed
For long term storage, repackaging of the
equipment and sealing of the cables in moisture-proof bags are recommended. The
shutdown and storage procedures of paragraph 3-16 or 3-17 should be followed to
protect the standby battery supply.
2-29. RESHIPMENT.  The environmental container offers adequate protection for
reshipment of the RCS-4B.  The container has bottom rails to facilitate handling with
a forklift.  The front and rear covers should be in place when moving the unit, and
extreme care should be taken to avoid damaging the instrument.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business