Click here to make tpub.com your Home Page

Page Title: Cold Start Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-890-10-8
4.5e.
Cold Start Procedure
FORMER PRIMARY
Prior to the fielding of ANCDs and PLGRs, the Cold Start procedure was
the primary method of net opening.
NCS RESPONSIBILITIES
The NCS is responsible for announcing the date-time of net opening,
ensuring net members have all required COMSEC key and FH data,
and for sending the net opening ERF.
LOADING THE RT
Net operators are required to load COMSEC key and FH data into their
radios in preparation for the Cold Start ERF. Each receiving radio must
have a TSK loaded in order to receive other required FH data by ERF
SENDING THE ERF
At the prescribed time, the NCS calls the net and announces that the
net opening ERF will now be sent. To do so, the NCS merely retrieves
appropriate data from the channel where it was stored and presses
[ERF] on the RT keypad. (See Figure 4-9 below or NCS Primary Task 4
for detailed procedures.)
RECEIVING THE ERF
Receiving operators standby at the announced time with FCTN set to
LD and MAN channel selected. When the ERF is received, operators
will note the signal display jump and the RT display will show "HF XXX".
The operator then presses [STO] followed by the channel number in
which the ERF data is to be stored.
ICOM FILL MINUS
If operators use ICOM fill procedures for their Cold Start net opening
preparations, but omit sync time, their radios will be fully operational
once the ERF loads sync time into the base clock
load SC frequency in MAN channel.
(1)
load COMSEC key and FH data into RT
(2)
Prepare radio to receive ERF: FCTN to LD,
(3)
COMSEC to CT CHAN to MAN, MODE to FH.
Standby for NCS to send ERF
(4)
When ERF is sent, note sig display activate and
(5)
display show "HF XXX."
Press [STO] and channel number for storage.
(6)
Set FCTN to SQ ON.
(7)
Call NCS and enter the net, or wait for NCS call.
(8)
When all operators have entered the net, the Cold
(9)
Start net opening is complete.
Figure 4-9. COLD START NET OPENING
SELECTIVE USE
The Cold Start method of net opening is more demanding than the Hot
Start procedure, but it can be useful in situations where the NCS
desires to bring all operators into the net at the exact same time.
4-17


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business