Hot Start Procedure
4.5d.
NCS requirements regarding the Hot Start net opening procedure are
NCS REQUIREMENTS
limited to setting the time of opening and ensuring that all net members
receive the loadset to be used and correct sync time.
The operator participating in a Hot Start net opening performs an ICOM
LOADING THE RT
fill (COMSEC key, FH data, and sync time) prior to the announced time
of net opening. That is the only preparation the operator needs to
make.
At the prescribed time for net opening, each net operator calls the NCS
NET ENTRY
and enters the secure, FH net. The Hot Start net opening procedure is
completed once all members have entered the net. An alternative
procedure is for the NCS to call net members at opening time, but
requirements remain the same. (See Figure 4-8, below, or Primary
Operator Task 3, "Perform Hot Start Net Opening," for detailed
procedures.)
Load RT using ICOM fill procedure.
(1)
Load sync time manually if required.
(2)
Call NCS and enter CT, FH net.
(3)
When all operators have entered the net, the Hot
(4)
Start net opening is complete.
Figure 4-8. HOT START NET OPENING
Because it is simple and easy to execute, the Hot Stat-t method is
PREFERRED METHOD
generally preferred for net openings. A major advantage of the Hot
Star-t procedure is that coordination requirements are minimized, and
operators have maximum latitude regarding RT loading and net entry.
The Hot Start procedure also recognizes that some operators, the
SPECIAL MEMBERS
commander's driver for example, may not be available at the
announced net opening time. Such special operators can enter the net
at whatever time they are available when Hot Start procedures are
used.