| TM 11-5820-695-35
Step
Control Setting
No Test Equipment
Equipment Under Test
Test Procedure
Performance Standard
b. Set the meter
b. None.
panel assembly
2A15A2 switch
to the + TEST
position.
c. Connect probe on c. The test point
one end of test
meter indication-
lead to TEST
should
LEAD jack on
read 80 minimum
meter panel assembly
2A15A2
and connect probe
on other end of
test lead to the
CV-3633/GRC-144(V),
3A1A1, REFLD PWR
test point.
d. To verify the
d. None.
reflected power
alarm adjustment
range, perform the
following steps:
(1) Using a small
tuning tool turn
the 3A1 R27 REFLD
PWR screwdriver
adjustment control
clockwise, until
the status panel
ALARMS SUMMARY
indicator just
changes from red
to green.
(2) Reconnect the
shelter waveguide
to the 3A734 (ANT)
flange and perform
the adjustment of
paragraph 5-32,
step t of TM 11-
5820-695-12.
Change 6
3-108
|