Click here to make tpub.com your Home Page

Page Title: Test Procedure-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
Step
Control Setting
No Test Equipment
Equipment Under Test
Test Procedure
Performance Standard
b. Set the meter
b. None.
panel assembly
2A15A2 switch
to the + TEST
position.
c.  Connect probe on c. The test point
one end of test
meter indication-
lead to TEST
should
LEAD jack on
read 80 minimum
meter panel assembly
2A15A2
and connect probe
on other end of
test lead to the
CV-3633/GRC-144(V),
3A1A1, REFLD PWR
test point.
d. To verify the
d. None.
reflected power
alarm adjustment
range, perform the
following steps:
(1) Using a small
tuning tool turn
the 3A1 R27 REFLD
PWR screwdriver
adjustment control
clockwise, until
the status panel
ALARMS SUMMARY
indicator just
changes from red
to green.
(2) Reconnect the
shelter waveguide
to the 3A734 (ANT)
flange and perform
the adjustment of
paragraph 5-32,
step t of TM 11-
5820-695-12.
Change 6
3-108


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business