|
| TM 11-5820-695-35
(9) Install preselector bandpass filter
3-44. Replacement of Preselector Bandpass Filter
2FL4 in electrical equipment cabinet 2A15, aligning filter
2FL4 (fig. 3-17)
mounting holes with mounting holes on preselector
a.
Removal.
support. Then secure preselector bandpass filter 2FL4
(1) Remove power from R-1467/GRC-
to preselector bracket using the two bolts and washers
144 (para 8-88a).
removed in step a(12).
(2) Loosen the two meter panel captive
NOTE
screws on meter panel assembly 2A15A2 (fig. 817).
After installing preselector bandpass
(3) Position the meter panel assembly
filter 2FL4 remove the thin sheet of
upward and lock it in position by using the panel locking
rigid material placed on top of
latch (fig. 3-19).
cabinet to support the input
(4) Loosen the four captive screws (fig.
waveguide section.
818) that secure tunnel diode amplifier 2A2 to its
(10) Secure preselector bandpass filter
mounting bracket a few turns each.
2FL4 upper flange to top of electrical equipment cabinet
(5) Disconnect the knurled connector
2A15 using the six screws removed in step a (11).
INPUT J1 on tunnel diode amplifier 2A2 from its mating
(11) Secure external input waveguide
connector on preselector bandpass filter 2FL4 by
section to preselector bandpass filter 2FL4 using the
rotating the knurled connector clockwise.
eight screws removed in step a(10).
(6) Remove eight input waveguide flange
(12) Connect the power cable 2A15W2P2
screws (fig. 3-20) securing external input waveguide
removed in a(9) above to the POWER JS connector (on
section to waveguide flange on preselector bandpass
the rear of the tunnel diode amplifier) by pushing the
filter 2FL4.
power cable connector in and rotating it 1/2-turn
NOTE
counterclockwise (as viewed from front of 2A2).
After removing the six screws (step
(13) Insert tunnel diode amplifier 2A2 into
electrical equipment cabinet 2A15 and rotate tunnel
a(7) below); obtain a thin sheet of
diode amplifier 2A2 in a counterclockwise direction until
rigid material about 1/16th inch thick
it can be slid into its mounting bracket.
and insert this material between the
top of the cabinet and the input
(14) Tighten the four captive screws on the
waveguide section to support the
tunnel diode amplifier mounting bracket until the tunnel
input waveguide section when
diode amplifier 2A2 is loosely held in position by the four
preselector bandpass filter 2FL4 is
captive screws.
being removed.
(15) Connect and hand tighten the knurled
(7) Remove six 2FL4 flange screws (fig.
connector INPUT J1 on tunnel diode amplifier 2A2 to its
mating connector on preselector bandpass filter 2FL4 by
top of electrical equipment cabinet 2A15.
rotating the knurled connector in a counterclockwise
direction.
(8) Remove two bolts and washers (fig.
818) securing lower part of preselector bandpass filter
(16) Tighten the four captive screws on the
2FL4 to electrical equipment cabinet 2A16 preselector
tunnel diode amplifier mounting bracket.
support and remove preselector bandpass filter 2FL4.
(17) Connect coaxial cable 2A15W1 to the
b.
Replacement.
OUTPUT J2 connector on tunnel diode amplifier 2A2.
(18) Release the meter panel assembly
(1) Install preselector bandpass filter
2A15A2 and position it against the cabinet.
2FL4 in electrical equipment cabinet 2A15 aligning filter
mounting holes with mounting holes on preselector
(19) Secure
meter
panel
assembly
support. Then secure preselector bandpass filter 2FL4
2A15A2 to electrical equipment cabinet 2A15 with the
to preselector bracket using the two bolts and washers
two meter panel captive screws.
removed in step a(8).
(20) Restore power to R-1467/GRC-144
NOTE
(para 38b).
After installing preselector bandpa ss
filter 2FL4 remove the thin sheet of
rigid material placed on top of
cabinet to support the input
waveguide section.
3-69
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |