|
| TM 11-5820-695-35
(3) Alternately tighten the two captive screws
that secure 1A12A1 and 1A12All to 1A12A12.
(4) Close the hinged front cover and tighten
the three cover captive screws securing the hinged front
cover.
(5) Insert replacement digital data modem
1A12 into electrical equipment cabinet IA15.
(6) Alternately tighten each assembly captive
screw on 1A12AlQ a few turns each. until digital data
modem lA12 is firmly seated in electrical equipment
cabinet 1A16.
(7) Reconnect coaxial cables 1A15W1,
1A145W2, 1Al5W4, 1A1lW7 and 1A'16W10 to their
proper connector's 1A12A12Jl, 1A12A12J5, 1A12Al'J3,
1A12A12J2 and 1A12A14J4, respectively, on digital
data modem 1A12.
(8) Set the POWER ON/OFF switch on meter
panel assembly lA15A8 to ON.
(9) Perform the T-1054/GRC-144 orderwire
level adjustment (TM 11-58209-12). TM 11-5820-695-
35
Change 5
3-50.1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |