Click here to make tpub.com your Home Page

Page Title: ALINEMENT PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-401-34-3/0967-LP-432-3060
A5200 SQUELCH AMPLIFIER ALINEMENT, NEW SQUELCH LEVEL. (CONT)
5-25.
CONTROL AND SWITCH SETTINGS (CONT)
POSITION/SETTING
CONTROL OR SWITCH
EQUIPMENT
OPERATE
OPERATE/OFF/STAND BY
AN/URM-103
15 Hz
FUNCTION
BAND SWITCH
30.00
RF TUNING
10
DEVIATION RANGE KHZ
LO, 0-10 KUV
RF OUTPUT
Fully counterclockwise
DEVIATION
Adjust until needle on IF UV RF
RF SET TO LINE
SET TO LINE meter is over red line
20 v
LO RF UV
ALINEMENT PROCEDURE
NOTE
Check the frequency counter to make sure that the signal generator is outputting exactly
30 MHz. The rf level must be increased temporarily to enable the frequency counter to
display. Adjust the AN/URM-103 RF TUNING control as necessary, reset to 20-v rf
level; then disconnect the T-connector from the counter.
5-120


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business