|
| TM 11-5820-401-34-3/0967-LP-432-3060
A5200 SQUELCH AMPLIFIER ALINEMENT, NEW SQUELCH LEVEL.
5-25.
PURPOSE. This procedure adjusts the receiver sensitivity to the 150-Hz NEW SQUELCH tone.
TEST EQUIPMENT AND MATERIALS
Signal Generator AN/URM-103
Matching Unit CN-901/U
Frequency Counter AN/USM-207
T-Connector UG-274/U
Loudspeaker LS-454/U
Power Supply PP-1104(*)/G
Voltmeter ME-30(*)/U
Test Cable No. 1
TEST SETUP. Connect the equipment as shown in test setup diagram
. Remove R-442/VRC top
cover. (See paragraph 2-7.)
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table. When using alternate equipment, inject 20-v rf at 30 MHz, 150-Hz modulation; deviation as
per alinement requirements.
CONTROL AND SWITCH SETTINGS
CONTROL OR SWITCH
EQUIPMENT
POSITION/SETTING
R-442/VRC
POWER
ON-RESET
BAND
MC-TUNE-KC
30.00
VOLUME
Fully clockwise
SQUELCH
NEW ON
5-119
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |