|
| TM 11-4920-296-14&P
2-59. OPERATION.
pulses into the test interrogations, and
2-60. Figure 2-6 shows the operating con-
checks/alarms associated with the Interro-
t r o l s a n d indicators of the test set.
gator Computer KIR-1A (when it is being
used for Mode 4 checks).
f u n c t i o n s . Operating instructions are in
------
CAUTION
accessory compartment in the equipment
------
cover. O p e r a t i o n of the test set con-
Never directly connect the output
s i s t s generally of the following steps;
of a transponder equipment to-the
(C1) connecting/locating the test set for
RADIATED TEST ANTENNA con-
e i t h e r the direct-connection or radjated-
nector of the test set. If for some
path method of test; (2) applying power
operation, it is required to feed
t o the test set; (3) lamp-testing and
the transponder output into the
self-testing of the test set; (4) selec-
RADIATED TEST ANTENNAcon-
t i o n of the specific type of system (sin-
nector, always insert an attenu-
g l e - c h a n n e l , etc) to be tested; (5) se-
ator (at least 50 dB) in series be-
lection of the transponder mode and code;
tween the transponder and the
and (6) observation of the ACCEPT and
test set.
REJECT Lamps.
2-61. Controls and lamps other than those
Use only the cable supplied for
M-4 connections.
associated with the basic testing operation,
c o n t r o l operation as injecting SLS
Controls, Indicators, and Connectors
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |