TB 9-2320-387-35-8
13-27. Connect P2 connector (48) of highway cable (24) to "Station-In" connector (47) on right rear
FFCS/L (5).
5
47
48
24
Figure 5-108.
13-28. Secure two highway cables (23) and (24) and rear A/C electrical cable (43) to tunnel shelf (44) with
three clamps (49) and existing screws (42).
49
42
23 24
~
44
43
49. CLAMP MS21333-76 QTY. 3
Figure 5-109.
5-92