TB 9-2320-387-35-8
13-18. Route two highway cables (23) and (24) along lower mounting surface (32).
13-19. Continue highway cable (24) to MCS/L (35) and connect P1 connector (33) to "Station-Out"
connector (34) on MCS/L (35).
13-20. Continue highway cable (23) through two access cutouts (27) to upper mounting surface (28), and
connect P2 connector (29) to "Station-In" connector (30) on front FFCS/L (31).
27
23
35
24
34
~
33
~
28
29
30
31
32
27
Figure 5-103.
5-89