• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 5. INSTALLATION PROCEDURES - Continued
CHAPTER 5. INSTALLATION PROCEDURES - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  15    16    17    18    19  20  21    22    23    24    25  
img
TB 9-2320-387-35-8
2-18. Install keyboard stowage box (17) on integrated rack (16) using four existing captive screws (18).
16
18
17
16. INTEGRATED RACK 889509-1 QTY. 1
17. KEYBOARD STOWAGE BOX 889519-1 QTY. 1
Figure 5-9.
5-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.