Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 5. INSTALLATION PROCEDURES - Continued
CHAPTER 5. INSTALLATION PROCEDURES - Continued
Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017)
Page Navigation
15
16
17
18
19
20
21
22
23
24
25
TB
9-2320-387-35-8
2-18.
Install
keyboard
stowage
box
(17)
on
integrated
rack
(16)
using
four
existing
captive
screws
(18).
16
18
17
16.
INTEGRATED
RACK
889509-1
QTY.
1
17.
KEYBOARD
STOWAGE
BOX
889519-1
QTY.
1
Figure
5-9.
5-9