• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 5. INSTALLATION PROCEDURES - Continued
CHAPTER 5. INSTALLATION PROCEDURES - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  11    12    13    14    15  16  17    18    19    20    21  
img
TB 9-2320-387-35-8
NOTE
Perform steps 2-8 through 2-13 if inserts are not installed in
tunnel floor.
2-8. Remove three existing rivets (13) from tunnel floor (10).
2-9. Locate and mark three holes (11) in tunnel floor (10).
2-10. Enlarge three holes (15) in tunnel floor (10) to 0.391-in.
2-11. Drill three 0.531-in. diameter holes (11) in tunnel floor (10).
2-12. Install three inserts (12) in tunnel floor (10).
2-13. Install three inserts (14) in tunnel floor (10).
11
12
10
13
14
~
7.00
11
C
L
11
15
12. INSERT 12446871-16 QTY. 3
14. INSERT 12446871-5 QTY. 3
Figure 5-5.
5-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.