• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 5. INSTALLATION PROCEDURES - Continued
CHAPTER 5. INSTALLATION PROCEDURES - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  12    13    14    15    16  17  18    19    20    21    22  
img
TB 9-2320-387-35-8
CAUTION
Air conditioner hoses are still attached. Do not attempt to remove
evaporator. Equipment damage may result.
2-14. Carefully lift air conditioning evaporator (7) and install tunnel insulation (3) on tunnel floor (10).
7
3
~
~
~
10
Figure 5-6.
5-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.