Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 5. INSTALLATION PROCEDURES - Continued
CHAPTER 5. INSTALLATION PROCEDURES - Continued
Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017)
Page Navigation
12
13
14
15
16
17
18
19
20
21
22
TB
9-2320-387-35-8
CAUTION
Air
conditioner
hoses
are
still
attached.
Do
not
attempt
to
remove
evaporator
.
Equipment
damage
may
result.
2-14.
Carefully
lift
air
conditioning
evaporator
(7)
and
install
tunnel
insulation
(3)
on
tunnel
floor
(10).
7
3
~
~
~
10
Figure
5-6.
5-6