TB 9-2320-387-35-7
3-28. Insert kickplate (67) into grooves of integrated rack (4).
3-29. Install Master Control Station (MCS) (69) on mounting surface of kickplate (67) using two existing
studs (68), washers (66), lockwashers (65), and nuts (62).
62
65
66
69
67
4
68
62.
NUT 120376 QTY. 2
65.
LOCKWASHER MS35338-45 QTY. 2
66.
WASHER 10910174-19 QTY. 2
69.
MCS A3206623 QTY. 1
Figure 5-17.
5-17