• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  19    20    21    22    23  24  25    26    27    28    29  
img
TB 9-2320-387-35-7
3-12. Place mounting bracket (33) on two existing left-hand studs (27).
3-13. Attach rod (30) to left rail weldment (32) and right rail weldment (29) with two screws (28).
3-14. Place rail assembly on two existing right-hand studs (27) on integrated rack (4) and attach left rail
weldment (32) to integrated rack (4) with three capscrews (31).
4
27
28
27
33
32
28
31 27
30
29
28.
SCREW MS35190-287 QTY. 2
29.
RIGHT RAIL WELDMENT 889567-22 QTY. 1
30.
ROD 889567-16 QTY. 1
31.
CAPSCREW B1821BH025C075N QTY. 3
32.
LEFT RAIL WELDMENT 889567-12 QTY. 1
33.
MOUNTING BRACKET 889567-14 QTY. 1
Figure 5-14.
5-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.