• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  17    18    19    20    21  22  23    24    25    26    27  
img
TB 9-2320-387-35-7
3-6. Install antenna power switch cover (1) on antenna power switch box (3) with four existing
screws (2).
1
2
3
Figure 5-12.
5-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.