• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued

Sincgars An/Vrc-88F/Vrc-89F, An/Vrc-90F, An/Vrc-91F, And/Vrc-92F; Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V); Defense Advanced Gps Receiver (Dagr) An/Psn-13; Vehicular Intercommunication Set (Vis) An/Vic-3(V)20; Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility, Expanded Capacity Armament Carrier, Iap/Armor Ready M1151A1 (2320-01-540-2038) Page Navigation
  31    32    33    34    35  36  37    38    39    40    41  
img
TB 9-2320-387-35-6
3-32. Install Full Function Control Station (FFCS) (74) on integrated rack (4) using two existing
studs (73), washers (66), lockwashers (65), and nuts (62).
62
65
66
74
~
4
73
62.
NUT 120376 QTY. 2
65.
LOCKWASHER MS35338-45 QTY. 2
66.
WASHER 10910174-19 QTY. 2
74.
FULL FUNCTION CONTROL STATION A3206624 QTY. 1
Figure 5-25.
5-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.