|
| TB 9-2320-387-35-4
Section VIII. SINCGARS MOUNTING TRAY, AMP GUARD, AND
FBCB2 COMPONENTS INSTALLATION
8-1. Install ramball mount (6) on integrated rack (8) with two screws (5), and one capscrew (12),
lockwasher (11), lanyard (10), and washer (9).
8-2. Install display isolation kit (2) on display unit mount (1) with four bolts (13), spacers (14), one
lanyard (10), and four wingnuts (15).
8-3. Install display unit (3) on display isolation kit (2) with four screws (4).
8-4. Install display unit mount (1) on ramball mount (6).
8-5. Install ground strap (7) on display ground stud (18) with existing lockwasher (17) and wingnut (16).
15
10
1
14
18
2
17
7
13
16
3
4
12
5
11
10
9
1.
DISPLAY LOCK ASSEMBLY 872843-1 QTY. 1
6
2.
DISPLAY ISOLATION KIT 872870-1 QTY. 1
7
3.
DISPLAY 881293-1 QTY. 1
5.
SCREW MS35190-291 QTY. 2
8
6.
RAMBALL MOUNT RAM-D-111U QTY. 1
9.
WASHER 2436161 QTY. 1
10.
LANYARD 8925T5-7X19 QTY. 1
11.
LOCKWASHER MS35338-44 QTY. 1
12.
CAPSCREW B1821AH025C100N QTY. 1
13.
BOLT MS35751-18 QTY. 4
14.
SPACER 10705AL315C QTY. 4
15.
WINGNUT MS51553-420 QTY. 4
Figure 5-27.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |