| TB 9-2320-387-35-3
16-7. Remove and discard four existing bolts from left and right B-pillars.
16-8. Remove paint from vicinity of four holes (11) on left B-pillar mounting (12). Apply anti-seize
compound as required.
16-9. Install left overhead rail (7) on left B-pillar (12) mounting with four capscrews (13) and four
washers (14). Do not tighten capscrews (13).
7
11
14
12
13
16-10. Remove paint from vicinity of four holes (16) on right B-pillar mounting (15). Apply anti-seize
compound as required.
16-11. Install right overhead rail (8) on right B-pillar mounting (15) with four capscrews (13) and four
washers (14). Do not tighten capscrews (13).
8
13. CAPSCREW B1821BH025C138N QTY. 8
14. WASHER 2436161 QTY. 8
16
15
13
14
Figure 5-57.
5-43
|