| 
 | ||||||||||
| 
 |  TB 9-2320-387-35-3 16-7. Remove and discard four existing bolts from left and right B-pillars. 16-8. Remove paint from vicinity of four holes (11) on left B-pillar mounting (12). Apply anti-seize compound as required. 16-9. Install left overhead rail (7) on left B-pillar (12) mounting with four capscrews (13) and four washers (14). Do not tighten capscrews (13). 7 11 14 12 13 16-10. Remove paint from vicinity of four holes (16) on right B-pillar mounting (15). Apply anti-seize compound as required. 16-11. Install right overhead rail (8) on right B-pillar mounting (15) with four capscrews (13) and four washers (14). Do not tighten capscrews (13). 8 13. CAPSCREW  B1821BH025C138N  QTY. 8 14. WASHER  2436161  QTY. 8 16 15 13 14 Figure 5-57. 5-43 | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |