13-29. Route all cables (62) forward from step 13-26 through cargo access hole (64) and in between
tunnel (65) and right rear seat (63).
64
63
62
~
65
Figure 5-60.
NOTE
Perform steps 13-30 and 13-31 if supplemental heater is not
installed. Perform 13-32 and 13-33 if supplemental heater is
installed.
Use MS21333-75 clamp if LVOSS is not installed. Use
MS21333-77 if LVOSS is installed.
13-30. Locate, mark, and drill three 0.147-in. diameter holes (66) in side of tunnel (67), evenly spaced
apart.
13-31. Secure all cables (62) to side of tunnel (67) with three clamps (68) and self-tapping screws (69).
NOTE
Use MS21333-75 clamp if LVOSS is not installed. Use
MS21333-77 if LVOSS is installed.
13-32. Locate, mark, and drill two 0.147-in. diameter holes (66) in side of tunnel (67), evenly spaced apart.
13-33. Secure all cables (62) to side of tunnel (67) with two loop clamps (68) and self-tapping screws (69),
and clamp (68), existing bracket (71), and screw (70).
65
67
66
67
~
66
~
62
~
68
68
69
68
68
62
69
69
70
69 71
68. LOOP CLAMP MS21333-75 QTY. 3
69. SELF-TAPPING SCREW 9421073 QTY. 2
Figure 5-61.
|