Click here to make tpub.com your Home Page

Page Title: Route all cables
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-387-35-1
13-29. Route all cables (62) forward from step 13-26 through cargo access hole (64) and in between
tunnel (65) and right rear seat (63).
64
63
62
~
65
Figure 5-60.
NOTE
Perform steps 13-30 and 13-31 if supplemental heater is not
installed. Perform 13-32 and 13-33 if supplemental heater is
installed.
Use MS21333-75 clamp if LVOSS is not installed. Use
MS21333-77 if LVOSS is installed.
13-30. Locate, mark, and drill three 0.147-in. diameter holes (66) in side of tunnel (67), evenly spaced
apart.
13-31. Secure all cables (62) to side of tunnel (67) with three clamps (68) and self-tapping screws (69).
NOTE
Use MS21333-75 clamp if LVOSS is not installed. Use
MS21333-77 if LVOSS is installed.
13-32. Locate, mark, and drill two 0.147-in. diameter holes (66) in side of tunnel (67), evenly spaced apart.
13-33. Secure all cables (62) to side of tunnel (67) with two loop clamps (68) and self-tapping screws (69),
and clamp (68), existing bracket (71), and screw (70).
65
67
66
67
~
66
~
62
~
68
68
69
68
68
62
69
69
70
69 71
68. LOOP CLAMP MS21333-75 QTY. 3
69. SELF-TAPPING SCREW 9421073 QTY. 2
Figure 5-61.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business