|
| TB 9-2320-280-35-3
19-19. Secure antenna cable (31) to antenna base (32) with existing screws (42), two loop clamps (46),
existing washers (43), existing lockwashers (44), and existing nuts (45).
19-21. Take slack out of all cables and store under EPLRS mount assembly (30). (Refer to Figure 5-61.)
19-22. Tighten screws and nuts on all clamps.
19-23. Secure right-side tunnel insulation. (Refer to TM 9-2320-280-20.)
42
43 44
43
46
32
45
42
43
43 44
45
47
46
31
46. LOOP CLAMP MS21333-102 QTY. 2
31
Figure 5-62.
5-50
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |