Click here to make tpub.com your Home Page

Page Title: Section XV. PLGR ANTENNA AND CABLE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-3
Section XV. PLGR ANTENNA AND CABLE INSTALLATION
15-1. Remove two plugs (1) from outer right-side windshield frame (3).
NOTE
Drilled holes on inside and outside of windshield frame should be
aligned with each other to allow routing of PLGR cable through
windshield frame.
15-2. Locate, mark, and drill one 0.375-in. diameter hole (2) in outer right-side windshield
frame (3).
3
2
1
0.75
3.00
Figure 5-44.
15-3. Locate, mark, and drill one 0.375-in. diameter hole (4) in inner right-side windshield frame (5).
4
1.25
~
5
5.12
Figure 5-45.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business